Energy
Peaking Power Plants
Endrick delivered civils packages for two 20MW flexible generation plants at Drumcross and Erskine, supporting the national grid during periods of peak power demand. Our works included earthworks, drainage installation, and enabling works, along with constructing permanent access roads. Each site was fully prepared for the installation of concrete foundations and platforms, ensuring a stable and engineered base for the flexible generation infrastructure.
PROJECT GALLERY